Our Projects

Each project has its own individual entities that make them personal, characteristic and special in their own right. Meliora takes on each project with its own unique elements in order to create sophisticated outcomes that tick every box.

Overcourt, Bisley – scullery and pantry renovation

Overcourt in Bisley, Gloucestershire, is a beautiful, Grade II listed manor house originally built in the fourteenth century and extended in the seventeenth, eighteenth and nineteenth centuries to provide a spacious home. The building boasts a wealth of original architectural features and is steeped in history.

Now a comfortable, well appointed, private home, the current owners needed extra kitchen space for entertaining, and decided to update the existing unused scullery and pantry, along with an old passage and WC. Meliora was appointed to manage the renovation project.

The works needed to bring the area up to date and make it a useable and attractive workspace, while ensuring that the original features and materials were retained and restored to the highest standards. It was also vital that any new materials used were sympathetic and compatible with the building and met the requirements of the Listed Building Consent.

The existing wooden partitions, plumbing and electrical fittings were stripped out, flagstones and suspended ceiling removed and paint was removed from the original walls to prepare the surface for plastering.

The floor was excavated to allow for underfloor heating throughout and to ensure a constant level. A layer of Glapor foam glass aggregate was laid first. Made from 100% recycled glass, it is thermally insulating, perfect for saving energy. Limecrete was used as the floor slab, because it is breathable and does not contain concrete, further increasing the sustainable nature of the renovation. Underfloor heating was laid, and the floor was finished with limestone tiles.

The walls and windows were repaired and finished in keeping with the building, then shelves were fitted in the pantry and the new kitchen units and appliances were installed. The new sanitaryware for the WC was installed.

Meliora managed the installation of all the new plumbing, power and lighting, and connecting the underfloor heating manifold to the existing heating system. It also fitted a new external joiner-made timber door, renovated the existing stone step, installed external damp proofing and drainage, and laid a new patio, making the external area as smart and functional as the new scullery inside.

New Spa pavillion and treatment rooms for Stratton House Hotel

Project Duration: 5 months
Project Cost: £700k
Over an 18 week period, five new treatment rooms, a relaxation room, a spa pavilion with jacuzzi, experience shower, steam room, and sauna were designed and constructed.

The new spa pavilion is located in the hotel’s garden and is surrounded by lush greenery. The pavilion itself is made from steel and glass, and the roof is covered in standing seam metal. The interior of the pavilion is designed to be tranquil and relaxing, with soft lighting, comfortable seating and calming music.

Refurbishment of Puckrup Hall Manor House Tewkesbury

Project Duration: 4 weeks
Project Cost: £105k
Puckrup Hall is a beautiful Grade II listed building situated in the historical town of Tewkesbury. Working closely with the designer and listed buildings, Meliora was able to refurbish the building whilst lovingly restoring the original features.

Works included new porcelain feature tiles to the entrance hallway, new parquet flooring in the library, Texture vinyl wall coverings and refurbishment and repair of the existing fireplaces

Meloria

&

Inndecs

Meloria is part of the Inndecs family, a family run construction business specialising in hospitality business fit outs.